<--
REPORTS ON GOES-7
-->
This
page contains information that pertains to the GOES-7 Satellite
including Eclipse Schedules, Pointing Data, and other GOES-7
related notices.
VTC Procedures Documents
Please print out the VTC procedure document listed below and post above terminal.
VTC Procedure (Word Document)
VTC Procedure (PDF Document)
*SPECIAL NOTE - Please remember that if the conference starts at 0130GMT, you are required to check in at a minimum of 30 minutes prior to the start of the conference. This time is needed to setup the equipment, arrange conference room, optimize signal levels, and/or to work out unforeseen personnel/technical problems.
PEACESAT Technical Logs
PEACESAT Technical
Event Log
This sheet is for logging problems and alignments.
For a PDF of the PEACESAT Technical Event Log click
here. (For an example click
here)
PEACESAT
Alignment Log
For a PDF of the PEACESAT Alignment Log click
here. (For an example click
here)
GOES-7
POINTING DATA
For a PDF of the current GOES-7 Pointing Data please click
here.
For a JPEG image of the current GOES-7 Pointing Data please click
here.
Please
note the following for the current Pointing Data:
Elevation Alignments - “Long Polar Bolt”
Must be done at either the SOUTH or NORTH PEAK. This alignment
should be done weekly to ensure a good signal for Analog and
Digital connections.
Azimuth Alignments - “East\West”
Must be done at either the NORTH-SOUTH CROSSING or SOUTH-NORTH
CROSSING. This alignment should only be done if repeated attempts
to do an Elevation Alignment still leaves your Earth Station
with a low receive signal. Please contact PEACESAT Honolulu prior
to performing this alignment.
The pointing data is saved as an Adobe Acrobat PDF file. If you
do not have a PDF Reader, it can be downloaded for free on the
Adobe website:
http://www.adobe.com/products/acrobat/readermain.html
|